How Much Does an Office Fit Out Cost Per Square Meter in Newcastle? (2025 Guide)

When planning an office fit out in Newcastle, one of the first — and often most misunderstood — questions is:
How much should I budget per square meter?

At Evercon, we guide clients through this question every day, and the honest answer is: it depends.
Fit out costs can vary significantly based on several key factors — but our 2025 benchmarks provide clarity for businesses looking to budget realistically.

Office Fit Out Costs in Newcastle — 2025 Benchmarks

While every project is unique, here’s a typical range for cold or warm shell office fit outs in Newcastle:

Fit Out Level Cost per m² (ex GST) Inclusions
Basic (No furniture) $600 – $900 per m² Partitions, carpet, paint, minimal services upgrades
Mid-Level Turnkey $1,200 – $1,600 per m² Full fit out, services, meeting rooms, tech-ready
High-End Premium $2,000 – $4,000 per m² Designer finishes, tech integration, custom joinery

Need a First Class Concept Plan Fast?

 

We’ll turn around a high-level concept and budget forecast within 48 hours — so you can make decisions quicker.
Our team works with you to deep dive your brief, understand your requirements to bring your vision into a 2D & 3D Concept Plan with option for Fly Through Concept with FInishes.

Check out 3D Walkthrough Video

What Drives Office Fit Out Costs in Newcastle?

Several local and project-specific variables influence costs:

  • Cold Shell vs Warm Shell: Is the space fully serviced or are you starting from a basic box?

  • Mechanical Services: Does the existing air con suffice, or is replacement needed?

  • Design & Layout: Open plan is more cost-effective than enclosed offices.

  • Technology Requirements: Advanced AV, data integration, and workspace tech can add significant cost.

  • Access & Location: Newcastle CBD access, lifts, and site constraints impact pricing.

Commonly Overlooked Costs in Fit Out Budgets

Many Newcastle clients underestimate or miss critical items when budgeting:

  • Design and services integration (electrical, mechanical, data).

  • CDC requirements — often necessary as part of approvals.

  • Program costs — delays can quickly escalate budgets if not managed proactively.

Real Project Cost Examples from Newcastle


Honeysuckle Drive — 850m² @ $1.15M:

Mid-level fit out from warm shell. Included all furniture, tech, and services integration.

Honeysuckle Drive — 800m² @ $4M:
Mid-high level fit out from cold shell. Fully turnkey solution with premium finishes and tech.


Hunter Street Newcastle — 850m² @ $1.5M:

Warm shell taken back to cold shell. High-end fit out, turnkey, premium workplace.

Hunter Street Newcastle — 1,000m² @ $4M:
Warm shell stripped back to cold shell. High-end fit out, full turnkey delivery.

These examples highlight how fit out costs scale depending on scope, services, and design intent.

Have a project?

Get in touch to talk to our team.

3 + 11 =

Full Project Process

R

Feasibility

Evercon assesses site constraints, project viability, and alignment with your strategic goals to ensure informed go/no-go decisions from the outset.

R

Concept Design

Our team works with you to shape initial ideas into functional, buildable concepts that reflect your vision and project intent.

R

Business Case + Cost Planning

Evercon prepares detailed cost estimates and supporting documentation to validate your project’s value, funding potential, and return on investment.

R

Developed Design & DA Submission

Designs are refined with consultant input, stakeholder feedback, and regulatory requirements to ensure clarity, compliance, and coordination.

R

Construction Documentation & CC

Designs are refined with consultant input, stakeholder feedback, and regulatory requirements to ensure clarity, compliance, and coordination.

R

Final Costing

A final contract price is confirmed, with clear scope, timelines, and procurement plans established for full project control.

Flexibility in engagement options:

  • Early Contractor Involvement (ECI)
  • Construction Management
  • Fixed Preliminary & Cost Plus
  • Design and Construct (D&C)
  • Fixed Price Lump Sum
R

Mobilisation

Evercon coordinates subcontractors, materials, and logistics to prepare the site and stakeholders for an efficient construction start.

R

Construction

Our team delivers with technical precision, transparent communication, and strong control over safety, quality, and timelines.

R

Occupation & Ongoing Support

Evercon manages final certification and handover, then remain available to support your operational success well beyond project completion.